5.2 KM HDD Trenchless Project for Hong Kong Airport
- Project Time: March, 2016 – March,2018
- Main Equipment:Two Package 1500 GPM Mud Recycling System include 6 sets GNZS703 Shale Shaker, 2 GNZJ703E-3S16N mud cleaner, 2 mud tanks, and centrifugal pumps and screw conveyor.
- Applications: HDD Trenchless mud cleaning and recycling
- Customer: Hong Kong Airport 5.2 KM Aviation fuel Pipeline installation
- Project Features:The project is used for the laying of aviation fuel pipeline in Hong Kong airport, which is contracted by Huayuan Company. And the two sets 1500GPM high-end HDD trenchless mud recycling system was made by GN Solids Control. The first HDD aviation fuel pipeline construction project in Hong Kong airport was completed on December 27, 2017. The second HDD aviation fuel pipeline construction project in Hong Kong airport was completed in March 9, 2018.Both of the two HDD crossing project are 5.2km.This success set the world's longest record for directional drilling crossing engineering at that time. The success of the crossing also opened a good situation for the construction of the third runway of Hong Kong International Airport.