Reference
China-Russia gas pipeline 5 sets high end mud recycling system
- Project Time: 2014 – 2019
- Main Equipment:5 Package 500 GPM high end HDD mud recycling system, include 5 desander shaker assemble, 5 desilter shaker assembly., 10 drilling mud centrifuge, 5 mud tanks.
- Applications: HDD Trenchless mud cleaning and recycling
- Customer: CHINA PETROLEUM PIPELINE BUREAU China-Russia gas pipeline Trenchless Project
- project features:
China Petroleum Pipleline Bureau(CPP) is the largest petroleum pipeline engineering company in China. CPP is the largest contractor for the China-Russia gas pipeline project. CPP owns over 20 packages of mud recycling system made by GN Solids Control. And the 5 sets high end HDD mud recycling system was applied in the China-Russia gas pipeline project.
China and Russia on December 2, 2019 launched a giant gas pipeline linking the countries for the first time.
Presiding by video link-up over an elaborate televised ceremony, Russian leader Vladimir Putin and Chinese counterpart Xi Jinping hailed the "Power of Siberia" pipeline as a symbol of cooperation.
The 3,000-kilometre (1,850-mile) pipeline -- which was called "the world's biggest construction project" -- will supply China with 38 billion cubic metres (1.3 trillion cubic feet) of gas annually when fully operational in 2025.
Russia and China signed the 30-year, $400 billion construction deal in 2014 -- Gazprom's biggest ever contract.