Cases
32 Sets Decanter Centrifuge for Algeria Project
- Project Time: March, 2015
- Main Equipment:32 Sets Decanter Centrifuge and feed pumps
- Applications: Oil gas drilling mud solids control
- Customer: EMEC solids control service contract for Sonatrach in Algeria
- Project Features:
1.Customer needs high quality and high standard. 2.Ambient temperature is up to 55 C degree. 3.Suitable for barite recovery and low gravity solids removal 4.All equipment should be interchangeable and easy for movement 5.Quantity is big and delivery should be done in 3 months.
Decanter Centrifuge for Abu Dhabi Project
- Project Time: June, 2016
- Main Equipment:14inch and 18 inch VFD Decanter Centrifuges, feed pumps and telescopic skids
- Applications: Oil gas drilling solids control and waste management
- Customer: ADNOC Solids Control and Waste Management Contract
- Project Features:
1.Customer needs high quality and high standard. 2.VFD Control Panel suitable for ambient temperature 55 C degree. 3.Explosion Proof Standard is ATEX Zone 1 4.All the equipment lifting should meet for DNV2.7-1 standard. 5.Quantity is big and delivery should be done in 3 months.
China-Russia gas pipeline 5 sets high end mud recycling system
- Project Time: 2014 – 2019
- Main Equipment:5 Package 500 GPM high end HDD mud recycling system, include 5 desander shaker assemble, 5 desilter shaker assembly., 10 drilling mud centrifuge, 5 mud tanks.
- Applications: HDD Trenchless mud cleaning and recycling
- Customer: CHINA PETROLEUM PIPELINE BUREAU China-Russia gas pipeline Trenchless Project
- project features:
China Petroleum Pipleline Bureau(CPP) is the largest petroleum pipeline engineering company in China. CPP is the largest contractor for the China-Russia gas pipeline project. CPP owns over 20 packages of mud recycling system made by GN Solids Control. And the 5 sets high end HDD mud recycling system was applied in the China-Russia gas pipeline project. China and Russia on December 2, 2019 launched a giant gas pipeline linking the countries for the first time.Presiding by video link-up over an elaborate televised ceremony, Russian leader Vladimir Putin and Chinese counterpart Xi Jinping hailed the "Power of Siberia" pipeline as a symbol of cooperation. The 3,000-kilometre (1,850-mile) pipeline -- which was called "the world's biggest construction project" -- will supply China with 38 billion cubic metres (1.3 trillion cubic feet) of gas annually when fully operational in 2025. Russia and China signed the 30-year, $400 billion construction deal in 2014 -- Gazprom's biggest ever contract.
5.2 KM HDD Trenchless Project for Hong Kong Airport
- Project Time: March, 2016 – March,2018
- Main Equipment:Two Package 1500 GPM Mud Recycling System include 6 sets GNZS703 Shale Shaker, 2 GNZJ703E-3S16N mud cleaner, 2 mud tanks, and centrifugal pumps and screw conveyor.
- Applications: HDD Trenchless mud cleaning and recycling
- Customer: Hong Kong Airport 5.2 KM Aviation fuel Pipeline installation
- Project Features:The project is used for the laying of aviation fuel pipeline in Hong Kong airport, which is contracted by Huayuan Company. And the two sets 1500GPM high-end HDD trenchless mud recycling system was made by GN Solids Control. The first HDD aviation fuel pipeline construction project in Hong Kong airport was completed on December 27, 2017. The second HDD aviation fuel pipeline construction project in Hong Kong airport was completed in March 9, 2018.Both of the two HDD crossing project are 5.2km.This success set the world's longest record for directional drilling crossing engineering at that time. The success of the crossing also opened a good situation for the construction of the third runway of Hong Kong International Airport.
Helicopter Mud System for Australia Customer
- Project Time: December, 2019
- Main Equipment:Drilling muds solids control package include: 6 mud tanks, 2 shale shaker, 1 mud cleaner, 8 centrifugal pump, 15 mud agitator, electrical control system, mud tank and attachments.
- Applications: Oil gas drilling mud solids control
- Customer: Australia Client for operation in Papua New Guinea
- Project Features:
1.Customer needs high quality and high standard.2.All electrical equipment should meet Australia and IECEX Standard.3.All mechanical safety should meet Australia standard.4.All Modules should suit for shipping by helicopter.5.Delivery time is urgent; customers need to ship the whole package by air.